Warehouse aisle with wrapped pallets on tall pallet racking

Updated · Rates as of Q2 2026

Kitting and Assembly

Kitting Services. Kitting and Assembly 3PL in Canada.

Kitting services combine separate components into one finished unit that is stocked and shipped as a single SKU, with light assembly, labeling and inserts done on the same line. Warehouse Bridge matches a kitting and assembly requirement to pre-vetted 3PL partner facilities in Canada, and the work is quoted per kit, per touch or per hour from your bill of materials.

Send the bill of materials and the run size once. Matched operators quote the same build, so the per-kit price and the setup terms can be compared directly.

No long-term lock-in Pre-vetted facilities One team, end-to-end
What We Match DEPLOYING NOW
  • Kit builds and bundles
  • Retail display and club pack builds
  • Light assembly
  • Labeling and inserts
  • Bill of materials and lot control

What are kitting and assembly services?

Kitting is the assembly of several separate items into one packaged unit that is stocked and shipped as a single product. A gift set, a starter bundle, a subscription box, a multi-pack and a retail display are all kits. A box that repeats every cycle is run as subscription box fulfillment. Assembly is the next step up: fitting parts together, adding batteries or hardware, or building a display from flat components.

A 3PL runs kitting as production work on a bench or a line, away from the pick faces, with the components drawn from stock it already holds for the brand. The finished kit is received back into inventory under its own SKU, ready for wholesale orders or parcel orders. Warehouse Bridge operates no warehouses. It matches the build to partner facilities with the bench space and labour for it, free to the shipper.

1
Submit requirements 5-min intake form
2
We match operators 2-3 vetted quotes
3
You choose an operator Same build, comparable price
Brands our team has worked with
150+ pre-vetted facilities Quoted per kit from your bill of materials

Need kitting capacity in Canada?

Get an Instant Estimate
How Matching Works

How do I go from a bill of materials to a matched kitting operator?

You send the build once, the Solutions Team matches facilities with the bench space and labour for it, and you choose from quotes on the same specification.

01

You Send the Build

Bill of materials, a photo or sample of the finished kit, run size, how often the run repeats, and the ship date.

One requirement
02

We Match Facilities

The Solutions Team shortlists partner facilities that run similar builds and can hold the components and the finished kits.

Matched options
03

You Compare and Choose

Each operator quotes the same build per kit, with its setup terms and minimum run stated. There is no fee to you.

Free to shippers
The Build

How does a kit build run from components to finished stock?

A kit build is a small production run. The steps are the same whether the kit has three components or thirty.

  • Bill of materials. The list of every component in one finished kit, with quantities, including the box, the filler and the label.
  • Work instruction. The order of assembly and the packing standard, written down with photos so every kit comes off the bench the same.
  • Sample approval. The operator builds one kit and the brand approves it before the run starts.
  • Component staging. Components are pulled from storage to the bench in the quantities the run needs, and shortages surface here, before labour is spent.
  • The run. Kits are assembled, checked, sealed and labeled with the finished SKU barcode.
  • Receipt to stock. Finished kits are counted, put away under the kit SKU, and the components are deducted from inventory.
Retail Builds

What are retail display and club pack builds?

A retail display build turns loose product and flat corrugate into a unit a store can put on the floor: the display is erected, filled to the planogram, topped with its header card, and either cartoned or built directly on a pallet and wrapped. A club pack build combines several retail units into one larger selling unit with its own barcode, often on a display-ready pallet.

Both are built to the retailer's specification, and both ship against a delivery appointment, so the run is scheduled backward from that date. The pallet itself has rules too: height, pattern and label placement. Those are covered under pallet services and retailer compliance builds, and the retail compliance and chargebacks guide explains what a miss costs.

Labeling and Assembly

What do labeling, inserts and light assembly cover?

Labeling is the most common kitting task and often the only one. Product that arrives without a scannable barcode, without bilingual text, or with the wrong price ticket is stickered unit by unit so it can be sold in Canada. Inserts are the paper side: instruction sheets, warranty cards, promotional offers and samples added to a carton or polybag.

Light assembly is anything a trained person does by hand or with simple tools at a bench. It stops where the work needs machinery, a controlled environment or a manufacturing licence. Marketplace prep is a close cousin with its own rules, covered in the FBA prep services guide.

Inventory Control

How do the bill of materials and lot control work?

The bill of materials is held in the warehouse system as the recipe for the kit SKU. When the operator reports a run of finished kits, the system consumes each component in the quantity the recipe states and adds the finished stock, so the brand always knows how many more kits the remaining components can make.

Lot control carries component batches through to the kit. If a component has a lot number or an expiry date, the finished kit records which lots went into it, and the kit takes the earliest expiry among its parts. That is what makes a recall or a quality hold workable: the operator can find every kit that holds the affected lot. Say at the start if any component is lot or date controlled, because it changes how the bench is set up.

Run Size

Is there a minimum run for kitting?

Operators usually set either a minimum run or a setup charge. Setting up a bench, staging components and approving a sample costs the same for a short run as for a long one, so a short run carries a higher price per kit. The minimum differs by operator and by how complex the build is, and it is stated in the quote.

Two things lower the per-kit price without changing the kit: a longer run, and a repeat schedule the operator can plan labour around. Very small hand-built sends, such as seeding kits for creators and press, are a different kind of work and are covered under influencer and PR kit fulfillment.

How It Is Quoted

How is kitting quoted: per kit, per touch or per hour?

Kitting is quoted from the build, not from a rate card. The rate module behind this site has no band for kitting labour, so the table states the billing unit for those lines and shows a range only where one is published (Warehouse Bridge network data, Q2 2026, CAD).

Kitting and assembly cost lines
Cost lineHow it is billedPublished range
Kit buildPer finished kit, once the build is defined and a sample is approvedQuoted per program. No published band.
Simple tasks: sticker, insert, bandPer touch, meaning each action on each unitQuoted per program. No published band.
Variable or one-off workPer hour of labourQuoted per program. No published band.
SetupA setup charge or a minimum run, by operatorQuoted per program. No published band.
Packaging and materialsAt cost or supplied by the brandQuoted per program. No published band.
Storage of components and finished kitsPer pallet position per month$8 to $28 per pallet per month
Receiving components, shipping finished palletsPer pallet moved$5 to $14 per pallet moved in or out
Shipping a finished kit as a parcel orderPer order picked, packed and shipped$1.75 to $5.00 per order

What moves the per-kit price: the number of components, the number of touches, fragile or hand-wrapped items, run size, and how often the run repeats. The subscription box 3PL guide works through the batch versus build-at-pick decision.

Quote Checklist

What does an operator need to quote a kitting job?

A kitting quote is only as good as the build description behind it.

  • The bill of materials: every component and quantity in one finished kit
  • A photo, drawing or physical sample of the finished kit
  • The assembly steps in order, including any wrapping, sealing or folding
  • Run size, and whether the run repeats and how often
  • Who supplies the box, filler, labels and inserts
  • Label requirements: barcode format, bilingual text, placement
  • Whether any component is lot controlled, dated, fragile or regulated
  • How components arrive and when
  • How finished kits leave: pallets to a retailer, cartons to stores, or parcel orders
  • The ship date or delivery appointment the run has to meet

Send your kitting requirement

Related

Related services and guides

Common Questions

Kitting and Assembly FAQ

What brands ask before sending a build to a 3PL.

There is no published per-kit band in Warehouse Bridge network data, because the labour depends on the bill of materials: component count, number of touches and run size. Operators quote per kit, per touch or per hour. The lines with published ranges are pallet storage for components and finished kits at $8 to $28 per pallet per month and pick and pack at $1.75 to $5.00 per order for kits shipped as parcel orders (Q2 2026 Warehouse Bridge network data).
Kitting groups separate finished items into one packaged unit with its own SKU. Assembly joins parts into a working or display-ready product. Most 3PL programs involve both, and both are done on a bench by hand or with simple tools.
It differs by operator. Most set either a minimum run or a setup charge, because setting up the bench and approving a sample costs the same for a short run as for a long one. The quote states the minimum and the setup terms.
Build in advance when every kit is the same: a batch run costs less labour per kit and the finished kit ships as a single pick. Build at the time of the order when the contents vary by customer. Many programs batch the common core and add the variable item at pick.
Yes. Partner facilities build floor displays, counter units, display-ready pallets and multi-unit club packs to the retailer's specification, then ship against the delivery appointment. Send the retailer's specification with the requirement.
Nothing. Warehouse Bridge is free to shippers and operates no warehouses of its own. The quotes you receive are each operator's own price for your build.

Your Kits.
Built and in Stock.

One bill of materials. Matched operators. Free to shippers.

Get an Instant Estimate
Get an instant estimate